Kmiller Homes Design Studio designs each home’s architecture and interiors within one studio, under the direction of founder Keith Miller. KMDS practices Integrated Luxury Design: architecture and interiors conceived together as one vision, from the first concept to the final detail.

Every residence begins with the architecture: the site, the form, the structure, and the spaces themselves. Once those spaces are defined, at Design Development 100%, our interior designers begin their work and develop the interiors alongside the architecture through to construction.

Part One

Architecture

The house: site, form, structure and the permit set.

  1. 1

    Programming

    1–2 weeks

    Review of the programming questionnaire and inspirational images

  2. 2

    Schematic Design

    2–3 weeks

    Site analysis, conceptual narrative and sketch plans

  3. 3

    Design Development 50%

    3–4 weeks

    Preliminary renderings, measured floor plans and 3D model

  4. 4

    Design Development 100%

    4–5 weeks

    Floor plans, elevations, sections and details

    Interiors Begin ↓

  5. 5

    Construction Documents 50%

    4–5 weeks

    Architectural drawings complete; engineering at 50%

  6. 6

    First Coordination

    1–2 weeks

    Architecture and engineering coordination

  7. 7

    Construction Documents 100%

    4–5 weeks

    Full set of drawings ready for submittals

  8. 8

    Permitting

    Approx. 4–8 months

    Weekly updates on permitting status

  9. 9

    Final Plan Coordination

    2–4 weeks

    Final interior design drawings, low voltage and permit-phase changes

  10. 10

    Construction

    Approx. 18 months

    RFI review, site visits and coordination meetings