Kmiller Homes Design Studio designs each home’s architecture and interiors within one studio, under the direction of founder Keith Miller. KMDS practices Integrated Luxury Design: architecture and interiors conceived together as one vision, from the first concept to the final detail.
Every residence begins with the architecture: the site, the form, the structure, and the spaces themselves. Once those spaces are defined, at Design Development 100%, our interior designers begin their work and develop the interiors alongside the architecture through to construction.
Part One
Architecture
The house: site, form, structure and the permit set.
- 1
Programming
1–2 weeks
Review of the programming questionnaire and inspirational images
- 2
Schematic Design
2–3 weeks
Site analysis, conceptual narrative and sketch plans
- 3
Design Development 50%
3–4 weeks
Preliminary renderings, measured floor plans and 3D model
- 4
Design Development 100%
4–5 weeks
Floor plans, elevations, sections and details
Interiors Begin ↓
- 5
Construction Documents 50%
4–5 weeks
Architectural drawings complete; engineering at 50%
- 6
First Coordination
1–2 weeks
Architecture and engineering coordination
- 7
Construction Documents 100%
4–5 weeks
Full set of drawings ready for submittals
- 8
Permitting
Approx. 4–8 months
Weekly updates on permitting status
- 9
Final Plan Coordination
2–4 weeks
Final interior design drawings, low voltage and permit-phase changes
- 10
Construction
Approx. 18 months
RFI review, site visits and coordination meetings